🚧🚜 𝐅𝐨𝐫 𝐭𝐡𝐨𝐬𝐞 𝐜𝐨𝐦𝐢𝐧𝐠 𝐭𝐨 𝐜𝐚𝐦𝐩𝐮𝐬 𝐌𝐨𝐧-Thurs 𝐉𝐮𝐧𝐞 𝟐-5: Our front lot will be CLOSED for paving and painting, including both driveways on Woodland Beach Road. Visitors must park on the street or enter from Ferry Dr. and park in the west lot. After the existing pavement was dug up for scheduled replacement last week, unstable subgrade was unexpectedly exposed, causing a delay in order to undercut and bring in 700 ton of gravel. This was an important added step because soft, unstable subgrade can lead to pavement problems like cracking, rutting, and frost heave. 𝑊𝑒 𝑙𝑜𝑜𝑘 𝑓𝑜𝑟𝑤𝑎𝑟𝑑 𝑡𝑜 𝑎 𝑏𝑒𝑎𝑢𝑡𝑖𝑓𝑢𝑙 𝑛𝑒𝑤 𝑑𝑟𝑖𝑣𝑒𝑤𝑎𝑦 𝑖𝑛 𝑓𝑟𝑜𝑛𝑡 𝑜𝑓 𝑠𝑐ℎ𝑜𝑜𝑙 𝑤ℎ𝑒𝑛 𝑖𝑡'𝑠 𝑎𝑙𝑙 𝑑𝑜𝑛𝑒!